vascular

Einstein Medical Health System

New Replacement Hospital Project

The New Einstein Medical Center Montgomery opened in September 2012. The project includes 96 medical/surgical beds, 22 ICU beds, 20 obstetrical beds, 6 LDR beds and 16 bed well baby beds, and an 8 bed NICU. The hospital also includes emergency, surgery, imaging, orthopedics & cardiovascular care. The hospital also includes a shared interventional suite with 2 interventional suites, EP and Cath with a shared recovery space with the OR.

Mitchell provided planning and procurement services for the hospital and is currently assisting the hospital with a Radiation Oncology Suite.

Project Type: 
Academic Medical Center
Women's & Children's
Hospital
Mitchell Services: 
Planning / Procurement / Installation
Project Team: 
Perkins + Will / Hammes Co

Baptist Health South Florida

Baptist Cardiac & Vascular Institute & Surgery Center

Baptist Hospital has launched a $90 million construction project to expand Baptist Cardiac & Vascular Institute and Baptist Hospital’s Surgery Center. This investment shows Baptist Health’s commitment to bringing the latest medical advances to their community. The new facility is slated to open in 2016.

Project Type: 
Community
Specialty
Hospital
Mitchell Services: 
Planning / Procurement / Specifications
Project Team: 
HKS / CCRD / Arellano

University of Miami Health System

Ambulatory Care and Cancer Center

The University of Miami Health System is expanding its clinical services south of its main campus which is located in the Civic Center of Miami. The new Center will provide an array of outpatient clinical services with a focus on oncology, orthopedics, cardio vascular care, and ophthalmology. The 220,000 square foot facility will have approximately 116 clinics, multi-modality diagnostic imaging, RAD/ONC, 6 surgical suites, interventional radiology, physical and rehabilitation medicine, and support services.

Project Type: 
Academic Medical Center
Specialty
Cancer Center
Rehabilitation
Clinics
Mitchell Services: 
Planning / Procurement / Installation
Project Team: 
Perkins and Will / Newcomb Boyd / CM-TBD

Our Lady of the Lake

Heart and Vascular Tower and Trauma/ER Expansion

The 9-story, 330,000 square foot Heart and Vascular building is dedicated to heart and vascular treatment. In addition to patient rooms and state-of-the-art operating rooms, cardiac catheterization and electrophysiology labs are included. These areas allow for the most advanced technology to be incorporated as new innovations are developed.

Project Type: 
Community
Specialty
Cardiac Center
Trauma Center
Hospital
Expansion
Renovation
Mitchell Services: 
Planning / Procurement / Installation
Project Team: 
VOA / Bradley Blewster Adams

M.D. Anderson Cancer Center

Pavilion Project

The Pavilion Project will provide a new, enlarged operating and interventional platform for surgeons, endovascular surgeons and interventional radiologists to perform procedures. This nine level facility, includes a basement expansion of CS/Materials, a new two story main entrance, lobby, and patient drop off area and two interventional platform floors. The third floor includes six interventional imaging suites and a hybrid OR. The fifth floor includes six new operating rooms, with an intra-operative CT, blood bank, OR pharmacy and PACU, Prep/Recovery beds. 

Project Type: 
Academic Medical Center
Specialty
Cancer Center
Expansion
Renovation
Mitchell Services: 
Planning / Procurement / Installation
Project Team: 
HKS/McCarthy / CCRD / Sparling / SMW

Work in Progress

Hybrid Rooms – the “Interventional Platform” flexible for any combination of subspecialties to bring image guidance to enable new procedures and interventions. It’s exciting to be working with many leaders such as:

Table Selection

It’s been interesting through the detailed planning of a variety of hybrid rooms that the table has become somewhat of a compromise. Once the focus shifts from determining what imaging modality – fluoroscopy, CT, MR, etc. and determining level of surgical intervention for lights and booms, the table becomes the next level of focus. Sometimes the table decision can get dismissed as a “given” to come with the imaging system.

Subscribe to RSS - vascular